top of page
Screen Shot 2024-03-02 at 14.32.14.png

Ivan Trujillo

Principal

Phone:

505.470.5506

Address:

8 Camino Nicolas

Santa Fe, NM 87507

PROFESSIONAL EXPERIENCE SUMMARY:

A project management professional with over 34 years of experience. I have been a project manager, lead designer, and/or Construction Manager / Observer on several successful multi-million-dollar projects for various public agencies in New Mexico. Most recently I managed the Santa Fe County Road Maintenance and Engineering Services team(s). The work included supervision of up to 40 team members. The road maintenance activities required regular collaboration with tribal government leaders from the Pueblos of San Ildefonso, Pojoaque, Tesuque, Nambe, and the Bureau of Indian Affairs.

DESIGN MANAGEMENT EXPERIENCE:
Managing and supervising project staff day-to-day activities associated with the development of construction plan documents that require multi-faceted knowledge of current design-related guidelines and policies including but not limited to AASHTO, Roadside Design Guide, MUTCD,
NMDOT Surveying Handbook, NMDOT Access Management Guidelines, Location Study Procedures, Hazardous Material Assessment Handbook, NMDOT Drainage Manuals, NMDOT Standard Specifications for Highway and Bridge Construction, Current NMDOT Design Directives, and NMDOT Standard Drawings.


CONSTRUCTION MANAGEMENT / OBSERVATION EXPERIENCE:
Administered construction projects from the Pre-Construction Conference to project close inclusive of the following responsibilities: Owner'
representative to the Contractor; oversee the progress of schedules; review

Burns Bridge Plan_Elevation_new1.png

contractor submittals, host and document weekly progress meetings, oversee project inspectors, review materials test results, negotiate change orders, administer change directives, certify monthly pay requests by Contractor, and control project documentation.

​

WORK EXPERIENCE

I have served as Project Manager, Design Manager, and/or Construction Manager / Observer collectively over $350 million (Construction Value), for the following projects:

​

BY THE END OF 2030 MY PORTFOLIO WILL BE AT 1, 350, 000, 000 (CONSTRUCTION VALUE) 

Underpass - Completion.jpg
Underpass1.jpg

March 2021 - July 2023

January 2018 - March 2021

March 1997 - January 2018 

May 1992 - March 1997

April 1989 - May 1992

Santa Fe County Public Works Department.
Engineering Services Manager

Souder, Miller & Associates
Senior Project Manager

The Louis Berger Group 
Design Manager / Project Manager

Bohannan Huston, Inc.

CAD Technician / Designer 

Scanlon and Associates 
CAD Technician

Santa Fe County:

  • Right of Way Acquisition of all Santa Fe County Roads within the

  • Pueblos of San Ildefonso, Pojoaque, Tesuque, and Nambe.

  • Northeast / Southeast Connector Road(s) Project

  • CR-84 Rehabilitation

  •  La Barbaria

  • Caja del Rio Reconstruction

  • County Rd 98 (Juan Medina Rd) Shoulder Widening

  • County Rd 84D Improvements

  • County Rd 54 Improvements

  • Pinon Hills Reconstruction

  • Santa Fe Public Works Facility (Structural / Civil)

New Mexico Department of Transportation:

  • NM-96 Shoulder Widening / Bridge Replacement

  • Interstate 25 (Exit 450) – South Raton Interchange Reconstruction

  • Interstate 25 – Raton Pass (MP 454 to Colorado State Line)

  • US-84/285 Pojoaque to Espanola (Study / Environmental Impact

  • Study (EIS) / Scoping Reports)

  • US-84/285 Santa Fe to Pojoaque (Study / Environmental Impact

  • Study (EIS) / Scoping Reports)

  • US-84/285 North Tesuque Boundary to Pojoaque (Cuyamungue and

  • Buffalo Thunder Interchanges / Frontage Roads)

  • US-84/285 Arroyo Seco to Espanola

  • US-64 La Jara Canyon

  • US-64/87 Raton to Clayton (Ports to Plains Corridor)

  • NM-599 / Caja del Rio Intersection Study

  • NM-599 (Veterans Memorial Highway – Airport Rd to Camino La

  • Tierra)

  • Bernalillo Rail Runner Park and Ride Lot

  • Interstate 40 Reconstruction (Rio Grande to the Big I)

  • NM-550 Aztec Main Avenue Revitalization

  • NM-516 / NM-550 Alignment Study

  • NM-550 Bernalillo Connectivity Study

City of Santa Fe:

  • Camino Entrada Intersection Improvements

  • Agua Fria / Cottonwood Intersection Improvements

  • Acequia Trail Pedestrian / Bicycle Underpas

  • Defouri St. Bridge Replacement

  • Zia Rd Drainage Improvements

  • Rail Trail Improvements

  • Santa Fe River

  • Siler Road Extension

  • Maez Rd Storm Drain

  • City of Santa Fe Park and Ride Lot

Rio Arriba County:

  • County Rd 142 – Medenales All Weather Crossing at El Rito Wash

  • County Rd 126 – La Mesilla Concrete Box Culvert Crossing of Arroyo de las Barracas

Bernalillo County:

  • Pear Rd Reconstruction

Pueblo de San Ildefonso:

  • Owners Representative – Pojoaque Basin Regional Water Study

  • Blue Dove Road

  • Wastewater Preliminary Engineering Report

Nevada Department of Transportation:

  • Interstate 515 – Preliminary design of a 17-mile widening of I-515 including 12 interchanges, a 1.5-mile viaduct, and numerous fly-over bridge locations

Miscellaneous:

  • Aldea de Santa Fe (435 residential subdivision)

  • Nambe Pueblo Casino (Site-Civil)

  • Arroyo Hondo de Santa Fe (200 residential subdivision)

20240206_063101 (1).jpg

Address

Phone

505.470.5506

Email

Connect

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram
bottom of page